Phase 1: Planning and Feasibility
This initial phase is where you determine what you can legally and realistically build.
-
Check Local Zoning and Ordinances: Research your city or county’s ADU laws. Key factors include maximum allowed size, setbacks (distance from property lines), height limits, parking requirements, and minimum lot size. This step determines the maximum size and location of your ADU.
-
Determine ADU Type: Decide on the best type of ADU for your property:
-
Garage Conversion: Uses existing structure, often fastest and cheapest.
-
Attached ADU: Addition to the main house.
-
Detached New Construction: Freestanding unit on the property (like a backyard cottage).
-
-
Establish Budget and Hire Professionals: Set a realistic budget, including soft costs (design, permits) and construction costs. Hire an architect or designer specializing in ADUs to create floor plans and elevations, and a general contractor (or design-build firm) for construction.
Phase 2: Design and Permits
The design is finalized and submitted for approval.
-
Schematic Design and Engineering: The architect drafts the final design, including layouts, exterior materials, and connection points to existing utilities. Structural, electrical, and plumbing engineering plans are developed.
-
Submit for Permits: The complete set of plans is submitted to the local building department. This process can take several weeks or months, as the city reviews the plans for compliance with zoning, building, and safety codes.
-
Final Material Sourcing: While permits are in review, you should finalize all material selections (cabinets, fixtures, flooring, windows) and order items with long lead times (like windows and custom doors) to prevent construction delays.
Phase 3: Construction
Once permits are issued, construction begins and follows a similar path to building a small house.
-
Site Preparation and Demolition: The site is cleared, and any necessary demolition (such as tearing down an old garage) takes place.
-
Foundation and Framing: For a new detached ADU, the foundation (slab or raised) is poured. Framing builds the walls, roof, and floor structure.
-
Rough-Ins (Utilities): This is the “behind-the-walls” stage:
-
Plumbing: Water supply and drain lines are run for the kitchen and bathroom.
-
Electrical: Wiring is installed for lights, outlets, and the main electrical panel.
-
HVAC: Heating, ventilation, and air conditioning systems are installed.
-
-
Inspections: The city inspector conducts rough-in inspections (for plumbing, electrical, and framing) to verify work meets code before the walls can be covered.
-
Drywall, Roofing, and Exterior: Insulation is added, followed by interior drywall, exterior siding, and the roof.
-
Finishing: Interior finish work begins with priming and painting. Flooring, cabinets, and countertops are installed. Final plumbing fixtures (faucets, toilet) and electrical fixtures (lights, outlets) are connected.
-
Final Inspection and Occupancy: A final inspection is conducted to ensure the ADU is fully compliant with all codes. Once approved, the city issues a Certificate of Occupancy, allowing the unit to be legally rented or occupied.